ERP for manufacturing and production

A production plan is a starting point. Material availability, actual consumption, finished output, quality decisions, and cost must remain understandable after the order has run.

In short

Plan the materials. Record the actual output. Follow the value. What does the order need, what was actually used, and why did finished output or cost differ from the plan?

Problems it solves

Follow materials all the way to finished output, with stock availability, quality decisions and cost in your books.

01

Planning against materials that are not ready

Calculate requirements from the BOM or recipe, review stock readiness, and explicitly reserve materials before execution.

02

Treating planned quantities as actual output

Record the material consumption and finished output that occurred. Review supported quality decisions and correction workflows.

03

Unclear movement of production value

Keep raw material, WIP, and finished-goods context distinct, then inspect the configured Inventory and Finance postings.

A typical day

A typical day

  1. A planner creates an order from the selected BOM or recipe.

  2. The material controller checks readiness and reserves the required stock.

  3. The production team records actual consumption and output.

  4. The team reviews quality, stock movements, WIP, and the configured accounting effect.

Who does what

Who does what

RoleModulesWhat they do
Production plannerProductionSet up the BOM/recipe, order quantities, dates, and any bulk output planning.
Material controllerInventory + ProductionCheck eligible stock, explicitly reserve it, and review shortages or approved alternatives.
Production supervisorProductionRecord actual consumption, stages, charges, output, and quality decisions.
Cost accountantInventory + FinanceTrace raw material, WIP, finished goods, variance, and configured financial posting.

Decisions it supports

Decisions it supports

  • Readiness

    Separate a read-only availability check from an actual confirmed reservation.

  • Yield and corrections

    Review partial output, short final yield, returned material, and the permitted reversal sequence.

  • Actual production value

    Compare material usage and supported extra charges with the resulting WIP/finished-goods context.

Exceptions handled

Exceptions handled

SituationWhat happensModules
A required material is shortThe readiness guard prevents treating the order as ready simply because a BOM exists.Production + Inventory
A component must be substitutedUse the approved alternative/conversion rules; posted usage must follow the required correction sequence.Production planning
Actual final yield is below the planRecord the supported actual output and its quality/cost implications.Production execution

What we set up

What we set up

  • Manufacturing products, BOMs/recipes, packages, units, and approved alternatives.

  • Raw-material, WIP, finished-goods, and quarantine/scrap location setup.

  • Tracking/dates, quality policy, order approvals, and stage/service definitions.

  • Inventory costing and the permitted manufacturing journal/account mappings.

Bring these to the demo

An order with insufficient material stock. · Actual output that differs from the planned yield. · The trace from material consumption to finished-goods value.

Does Production work independently of Inventory?

Production uses Inventory materials and finished-goods movements. Its operational setup and execution need the appropriate enabled modules and configuration.

Are manufacturing accounting entries always enabled?

Finance integration and manufacturing postings depend on the configured release and accounting setup. Validate the accounts, event timing, and reporting with your own scenario.

What does manufacturing planning need before an order starts?

The team needs the intended finished product, BOM/recipe, yield, component quantities, operations or stages, material locations, and the required tracking/quality rules. Prospiro then connects the production plan to eligible Inventory quantities and explicit reservation.

What is the difference between availability and reservation?

Availability checks whether eligible material is currently present. Reservation explicitly commits that stock to the production work. Checking availability alone does not prevent another eligible transaction from using the same free quantity.

How does the team record a different actual yield?

Record actual consumption and partial/final finished output through the execution workflow. Review the remaining materials, tracking, quality result, and final-yield controls. Inventory and the configured accounting flow then explain physical stock and WIP/finished-goods value.

Can a component be substituted after production starts?

An eligible alternative follows the order’s replacement and conversion rules. Posted usage must be reversed before the relevant component can be replaced; the supported change releases the replaced holds and adjusts the order plan without silently rewriting the reusable BOM.

Book a demo

See Prospiro run your own process.

Tell us what you sell, stock and deliver. We plan the session around the modules you need, in English or Arabic.

  • Built around your products, routes and documents
  • Includes the exceptions, not only the happy path
  • Your request goes straight to our team

Prefer email? info@prospiro.ai

What do you want to see?
We use your details only to reply to your request and follow up on it. Privacy policy
VAT calculator